Wiring diagram Of ANT BMS 10S-32S 80A-120A Smart BMS
Wiring diagram Of ANT BMS 10S-32S 80A-120A Smart BMS
The wire label is B-, and it’s a blue-colored wire. Connect this wire harness to the battery’s negative pole.
When making the connection, be sure to connect B- to the battery’s negative terminal first before inserting the sampling line terminal. (Warning! Always connect B- to the battery’s negative pole first, or it may cause damage to the board).
The wire label is C-, and it’s a black-colored wire. Designed for the same MOS port, the charge and discharge negative poles share a single port. Connect C- to the negative terminal of both the charger and the load.
Consists of a wire harness for sampling the voltage of 4 series individual cells and the BMS power supply wire harness.
In total, there are 6 wires in the individual cell sampling wire harness and BMS power supply wire harness.
It needs to be activated first after Protection Board boot up. There are generally three methods:
1. Activation through charging with a charger, our protection board has a charging activation function (the charger should be without the communication and voltage detection features).
2. Activation through the communication interface by short-circuiting on SW and GND pins, for details, please refer to section 13. Interface Definition.
3. Activation using a Multimeter in the diode mode, connect the red probe to the blue power line B- of the protection board, and the black probe to the black power line C-.
Wiring diagram Of ANT BMS 10S-32S 80A-120A Smart BMS
Wiring diagram Of ANT BMS 21S-30S 170A-420A Smart BMS
Wiring diagram Of ANT BMS 10S-24S 50A-220A Smart BMS
Wiring diagram Of ANT BMS 17S-24S 130A-420A Smart BMS
Wiring diagram Of ANT BMS 17S-24S 50A-100A Smart BMS
Wiring diagram Of ANT BMS 8S-22S 40A-230A Smart BMS
Wiring diagram Of ANT BMS 8S-20S 110A-230A Smart BMS
Wiring diagram Of ANT BMS 7S-16S 40A-420A Smart BMS
Wiring diagram Of ANT BMS 3S-4S 60A-380A Smart BMS
Copyright ©Shenzhen ANT Electronics Co.,Ltd