Leading The Technology, Ensuring Safety, ANT Smart BMS Guards You!

ANT BMS

Wiring diagram Of ANT BMS 17S-24S 50A-100A Smart BMS

  • Interface Definitions

    Wiring diagram Of ANT BMS 17S-24S 50A-100A Smart BMS (1)

  • Battery negative pole

The wire label is B-, and it’s a blue-colored wire. Connect this wire harness to the battery’s negative pole.
When making the connection, be sure to connect B- to the battery’s negative terminal first before inserting the sampling line terminal. (Warning! Always connect B- to the battery’s negative pole first, or it may cause damage to the board).

  • Charge and discharge negative pole

The wire label is C-, and it’s a black-colored wire. Designed for the same MOS port, the charge and discharge negative poles share a single port. Connect C- to the negative terminal of both the charger and the load.

  • Voltage sampling

Consists of a wire harness for sampling the voltage of 24 series individual cells and the BMS power supply wire harness.
In total, there are 26 wires in the individual cell sampling wire harness and BMS power supply wire harness.

Wiring diagram Of ANT BMS 17S-24S 50A-100A Smart BMS (2)

Wiring diagram Of ANT BMS 17S-24S 50A-100A Smart BMS (3)

Wiring diagram Of ANT BMS 17S-24S 50A-100A Smart BMS (4)

Wiring diagram Of ANT BMS 17S-24S 50A-100A Smart BMS (1)

Wiring diagram Of ANT BMS 17S-24S 50A-100A Smart BMS (5)

  • Wiring Diagram

    24S Wiring diagram Of ANT BMS 17S-24S 50A-100A Smart BMS

    23S Wiring diagram Of ANT BMS 17S-24S 50A-100A Smart BMS

    22S Wiring diagram Of ANT BMS 17S-24S 50A-100A Smart BMS

    21S Wiring diagram Of ANT BMS 17S-24S 50A-100A Smart BMS

    20S Wiring diagram Of ANT BMS 17S-24S 50A-100A Smart BMS19S Wiring diagram Of ANT BMS 17S-24S 50A-100A Smart BMS18S Wiring diagram Of ANT BMS 17S-24S 50A-100A Smart BMS17S Wiring diagram Of ANT BMS 17S-24S 50A-100A Smart BMS16S Wiring diagram Of ANT BMS 17S-24S 50A-100A Smart BMS15S Wiring diagram Of ANT BMS 17S-24S 50A-100A Smart BMS14S Wiring diagram Of ANT BMS 17S-24S 50A-100A Smart BMS13S Wiring diagram Of ANT BMS 17S-24S 50A-100A Smart BMS

  • Protection Board Activation

    It needs to be activated first after Protection Board boot up. There are generally three methods:

    1. Activation through charging with a charger, our protection board has a charging activation function (the charger should be without the communication and voltage detection features).

    2. Activation through the communication interface by short-circuiting on SW and GND pins, for details, please refer to section  Interface Definition.

    3. Activation using a Multimeter in the diode mode, connect the red probe to the blue power line B- of the protection board, and the black probe to the black power line C-.

Additional ANT BMS wiring schematics can be found below